Serenity Cove

In late 2015 Golding Urban was engaged by Sime Darby to carry out bulk earthworks across 11 stages on their prestigious Serenity Cove Project. Works included construction of canals, revetment walls and a marine navigational lock. The works were delivered in 3 separable portions: Navigational Lock No. 3 Phase 5 Bulk Earthworks and Preload Stages […]

Learn more >

Gladstone NDRRA road and drainage

In January 2016, Gladstone Regional Council engaged Golding to restore road and drainage infrastructure damaged by ex-Tropical Cyclone Marcia in February 2015. The works were concentrated throughout the western part of the Gladstone Regional Shire and formed part of the broader NDRRA program that is jointly funded by the Commonwealth and Queensland State Governments. The […]

Learn more >

Kogan Creek Mine

Kogan Creek Mine is an open cut mine located in the Surat Basin of Southern Queensland, approximately 15km south of the township of Brigalow. The mine is owned by CS Energy and supplies their adjacent Kogan Creek Power Station with approximately 2.5Mt of coal each year. The Kogan Creek Power Station was opened in 2006 […]

Learn more >

Baralaba coal train load out

The construction of a new 5.5km Rail Loop and Train Load Out facility located near Moura was required to facilitate the increase in coal exports from the Baralaba Coal Mine. Golding delivered all Civil works for Baralaba Coal to construct the new facility, including extensive earthworks and road works across the site. New borrow pits […]

Learn more >

Sunland’s townhouse portfolio – civil component

Golding have been responsible for the civil works associated with townhouse and freehold subdivision lots on various developments on the Gold Coast for listed property developer Sunland Group. Golding works closely with the client and their consultants to deliver civil infrastructure works that tie in with their sales priorities, program drivers and timeframes. On a […]

Learn more >

Moura West Rail

To allow the increase in coal exports from the Baralaba Coal Mine, a 6.5km extension to the existing Moura rail line into a new 5.5km Rail Loop and Train Load Out facility located 3km from Moura was required. Golding delivered all Civil works for Aurizon for the 6.5km extension, with exception to the ballast and […]

Learn more >

Woolgoolga to Ballina

Project is the first stage (of 3) of the early works (soft soil treatments) for approximately 7.6km of the future upgrade of the Pacific Highway from Woolgoolga to Ballina. Project involves construction of embankments, surcharges, stability berms, wick drain installation and relocation of water and sewer services. A key challenge of the project is the […]

Learn more >

Gladstone NDRRA (Stage 1 & 3)

Gladstone Regional Council engaged Golding to undertake Stage 1 and Stage 3 restoration works on parts of Gladstone Regional Council’s road and drainage infrastructure which were damaged by severe weather and flood events in 2010 and 2011. The works focused on arterial routes connecting Gladstone to areas such as the Discovery Coast. The projects involve […]

Learn more >

Bundaberg NDRRA

This project was in response to the January 2013 rains from ex-Tropical Cyclone Oswald that severely affected the Bundaberg Region causing widespread floods and significant damage to local infrastructure. Due to the fast-tracked nature of the project, at contract award, the actual scope of works was uncertain. As a result, the works were released intermittently […]

Learn more >

Ipswich Boonah Road

The Ipswich Boonah Road provides the main link from the Cunningham Highway at Ipswich to Beaudesert and the Mount Lindsay Highway. It is a two-lane, two-way, bitumen-sealed, 10m-wide (average), single-carriageway, undivided rural road. The road carries more than 5,700 vehicles per day with more than 12% being heavy vehicles. The road was damaged in the […]

Learn more >

Curragh Coal Mine

The Curragh Mine is an open cut mine located in the Bowen Basin, approximately 10 km north of Blackwater in central Queensland. The Mine produces a variety of high quality low-ash met coal products for export and thermal coal for domestic use. Curragh has been operating since 1983 and in 2017 was the sixth largest […]

Learn more >

Calliope crossroads upgrade

The intersection of the Bruce and Dawson Highways at Calliope, commonly known as the Calliope Crossroads, is a critical regional traffic hub in Queensland linking port and industrial facilities in Gladstone, established agricultural areas in the Callide and Dawson valleys, and the developing coalfields in the Bowen and Surat basins. In excess of 14,000 vehicles, […]

Learn more >

John Muntz Causeway

The Department of Transport and Main Roads (DTMR) undertook this project to provide the road with better flood resilience and reduce the impact of flooding during wet-weather events. The new roundabout allows traffic to flow more freely than previously and was designed to take into account the anticipated future growth in the area. The project […]

Learn more >

Daunia Mine

Daunia Coal Mine in the Bowen Basin near Moranbah is the ninth coal mine built by BMA. Golding successfully delivered two infrastructure projects to prepare the mine for operation: a contract for bridges and crossings; and a contract for civil works. The scope for the bridges and crossings contract involved: 70m-wide and 46m-long (three spans […]

Learn more >

GLNG mainland facilities

This project involved the design and construction of loading and unloading facilities (onshore and marine) to support equipment and personnel engaged in the construction of the Gladstone Liquefied Natural Gas (GLNG) plant on Curtis Island. The scope of works included the design and construction of: The temporary loading dock facility at Fisherman’s Landing Load-on/load-off (lo-lo) […]

Learn more >

Stockland’s Gold Coast developments

Since 2010, Golding has been carrying out the progressive rollout of residential subdivision works for Stockland Development across 5 of their communities in the Gold Coast region under a rolling annual term contract. Works occur simultaneously across sites to achieve best use of resources, to minimise overheads and to return considerable savings to the client. […]

Learn more >