Home

Kogan Creek Levee

Building upon existing mining relationship with CS Energy, Golding was engaged to raise the height of the existing perimeter levee by two metres to provide additional flood immunity.

Golding worked with CS Energy to identify suitable material from within the mine site, and to deliver the project ahead of the required date.

Golding utilised local service providers including all geotechnical testing and inspections. At completion of the project Golding provided the design RPEQ certification for the regulated structure.

Download project fact sheet